Technology Development
Wireless Downhole Command Centre
Reopening or reconfiguring a completion today usually needs an intervention: rig time, wireline or coiled tubing, and the risk that comes with them. L&P Operations is developing a wireless alternative, where one coded signal from surface reopens the well.
Stage 1: Wireless isolation and flow reinstatement​
The first tool isolates the well and later restores flow on command from surface, with no intervention. It works with acoustic, EM, pressure or wired signalling. Several layers of verification run before any actuation.
Roadmap
Stage 1 - Wireless isolation and flow reinstatement
Stage 2 - Downhole pressure and temperature monitoring
Stage 3 - Downhole command hub
Stage 4 - Flow and phase metering
Stage 5 - SSD/ICD control and gas flushing
In-line power generation
​A turbine generator that harvests energy from injection-water flow to power remote wellsite equipment, in the 30-300 kW range. It is now in development with an operator partner.
Work with us
We welcome operators and service companies interested in field trials or in technology collaboration. Contact mike.duncan@lnpoperations.com.
Contact Us
Address
L&P Operations CO FZCOIFZA
Dubai - Building A1, office 001 - 9257
PO Box 487076 Dubai, United Arab Emirates
Contact
Michael Duncan - Managing Director Phone: +971.56.164.3663